Al-Takamul Engineering contributed to the supply of advanced medium-voltage infrastructure solutions for the CTI Main 33kV MV Substation project with a total capacity of 2MVA.
The project included specialized medium-voltage systems and monitoring solutions designed to support operational reliability, electrical protection, system stability, and efficient power distribution for critical industrial operations.
The supplied solutions incorporated Schneider Electric medium-voltage technologies and protection systems engineered to ensure safe operation, dependable performance, and compliance with modern industrial power infrastructure standards.
Systems Used
-
MV Substation
:
Supply of medium-voltage electrical infrastructure solutions designed to ensure reliable power distribution, operational safety, electrical protection, and stable performance for industrial and critical power applications.
-
SCADA
:
Supply of SCADA monitoring and control solutions enabling real-time supervision, operational monitoring, alarm management, and efficient control of medium-voltage electrical systems and critical infrastructure assets.